Skip to content
Free tool · BOM Generator

Free BOM Generator

Create accurate Bills of Materials (BOMs) in minutes with our free BOM generator. Add components, calculate material requirements, costs, and generate production-ready BOMs instantly.

Your go-to BOM generator for effortless material planning

Add components, adjust quantities, and watch your total material cost update in real time. No spreadsheets, no formulas, no manual math.

/tool/bom-generator/

Product details

Components

Indent a line to place it inside the sub-assembly above; its cost rolls up automatically.

#Part no.DescriptionQtyUOMScrap %Unit costSupplierLine costActions
1
$0.00
2
$0.00
3
$0.00
Material cost per unit$0.00

How it works

How to use this BOM tool?

Creating a Bill of Materials takes four simple steps with Procol's free BOM tool:

  1. Step 1

    Add product details

    Enter your product name, product code, and other basic details to start your Bill of Materials.

  2. Step 2

    Add components

    List each component with its part number, description, quantity, unit of measure, and cost per unit.

  3. Step 3

    Calculate total material cost

    The BOM generator automatically calculates the total material cost based on the components and quantities you enter.

  4. Step 4

    Download your BOM

    Download your completed Bill of Materials in PDF or CSV format for sharing, printing, or procurement planning.

Why use Procol's BOM generator

Create accurate, structured Bills of Materials faster with simple tools designed to make BOM creation and export effortless.

Effortless auto calculations

Material costs update instantly as you add components; no manual formulas.

Standard industry fields

Part numbers, UOM, scrap, and supplier fields are built in, so your BOM is usable the moment you export it.

Professional BOM format

Get a clean, structured document ready to send to suppliers or production teams.

No signup or app download required

Generate your BOM in the browser and download it in seconds.

Built for every business size

From a single prototype to multi-SKU production runs.

Export in the format you need

Export to PDF to share, or CSV to plug into Excel, inventory, or ERP systems.

Built for everyone who touches a BOM

Procurement teams

Skip the back and forth. Get a clean, priced component list you can turn into supplier RFQs the same day.

Engineering & product teams

Keep every revision consistent. No more three versions of the same BOM floating in different inboxes.

Manufacturers and production planners

Know your material cost and quantity needs before the production run starts, not after.

Small business owners

Cost out your product like a manufacturer does, without buying manufacturing software to do it.

Single-level vs. multi-level BOM

The main difference is in the level of detail each BOM provides. A single-level BOM shows the direct components, while a multi-level BOM shows the complete product structure, including sub-assemblies and their components.

Single-level vs. multi-level BOM: Single-level BOM compared with Multi-level BOM
Single-level BOMMulti-level BOM
Lists only direct componentsIncludes components and sub-assemblies
Uses a flat structureUses a hierarchical structure
Easier to create and reviewProvides greater detail and visibility
Best for simple productsBest for complex products

BOM vs. bill of quantities (BOQ)

A Bill of Quantities (BOQ) covers the materials, labor, equipment, and work required for a project, while a Bill of Materials (BOM) lists the parts and raw materials needed to manufacture or assemble a product.

BOM vs. bill of quantities (BOQ): Bill of Quantities (BOQ) compared with Bill of Materials (BOM)
FeatureBill of Quantities (BOQ)Bill of Materials (BOM)
FocusMaterials, labor, equipment, and project workParts, components, and raw materials
Commonly used inConstruction and engineeringManufacturing and product development
Main purposeEstimating costs, tendering, and project planningProcurement, production, and inventory management
Cost detailsOften includes unit rates and total costsUsually focuses on quantities and specifications

Integration of BOM data with ERP/MRP systems

BOM data can be integrated with ERP and MRP systems to keep product structures, materials, quantities, and inventory information in sync. This helps teams manage procurement, production planning, inventory, and material requirements from a central system.

Frequently Asked Questions About the BOM Generator

Quick answers about creating, costing and exporting a Bill of Materials.

A BOM generator creates a Bill of Materials from the information you provide, while BOM software is designed to manage BOMs throughout their lifecycle. BOM software typically supports version control, updates, collaboration, approvals, and integration with other systems such as ERP or procurement platforms.

An engineering BOM (EBOM) lists the components, parts, and specifications required to design a product. A manufacturing BOM (MBOM) reorganizes and expands that information to show the parts, assemblies, consumables, and processes needed to manufacture and assemble the finished product.

A BOM generator is a tool that creates a structured list of the materials, parts, and quantities needed to build a product, along with their costs. It makes that list easy to share with suppliers, production teams, and other stakeholders for pricing, planning, and procurement.

Enter your product details, add each component with its unit, quantity, cost, and supplier, then download your finished BOM as a PDF or CSV.

The BOM creator allows you to export your finalized BOM in PDF or CSV format. Use PDF if you require a shareable, professional-looking document, and use CSV if you require a spreadsheet-compatible document to analyze the BOM in systems like Excel or Google Sheets.

Yes! This BOM tool automatically calculates total material cost by multiplying each component's unit cost by its quantity as you enter it.

Yes. Procol follows enterprise-grade security practices to protect the information you share. Procol is SOC 2 Type II certified, ISO 27001 aligned, and GDPR compliant, with safeguards including encryption, access controls, network security, logging, and monitoring.

Businesses such as manufacturers, product teams, purchasers, engineers, and any companies that require documentation of the parts that are needed to build an item can utilize a BOM generator.

Depending on your requirements, a BOM can include:

  • Product name and SKU
  • BOM number and revision
  • Effective date and preparer
  • Production or batch quantity
  • Part number and component description
  • Unit of measure
  • Required quantity and scrap
  • Unit and total cost
  • Supplier information
  • Additional notes or specifications

After you finalize your BOM, you have the option to either generate material costs and print the BOM or export it as a PDF file or as a CSV file. You can further utilize your BOM from CSV for analysis in a spreadsheet or import it into any compatible inventory, manufacturing, and ERP systems.